  • 60,000TSteel dismantled
  • >95%Resource recovery rate
  • Scheduling & Sequencing Plans
  • Cleaning of Residual By Products
  • Asset Recovery & Salvage
  • Decommissioning
  • Scaffolding & Ropes Access
  • Enviro Controls & Monitoring
  • Mechanical Demolition
  • Temp Works Engineering
  • Long Reach Demolition
  • Engineered Modelling & 3D Simulation
  • Third Party Engineering
  • Stakeholder Engagement
  • Hazmat Removal
  • Cut & Lift Demolition
  • Propping & Bracing
  • Explosive Demolition
  • Concrete Recycling
  • Steel Recycling
  • Waste Transfer
  • Waste Stream Tracking
  • Sustainability Reporting
  • Site Establishment
  • Induced Collapse
  • Cranage & Rigging
  • Social Procurement
  • Live Environments
  • Largest single campaign of oil and gas decommissioning in Australia
  • Accept care, custody and control of up to 12 topsides and 11 jackets at Barry Beach Marine Terminal, serving as the Onshore Reception Centre for safe decontamination and dismantling
  • Decontamination of contaminated process equipment
  • Design and execution of felling for the structures
  • Waste segregation, classification and management, including design and install of a waste water treatment system
  • Intersection of the project site with an internationally significant wetland, designated under the Ramsar convention
  • Project site borders an operational marine supply base to support remaining facilities in the Bass Strait. Nearby proximity to another port facility, commercial and residential properties
  • Strict enviro controls and measures. Management of contaminated process equipment during decontamination and demolition