CD1C Fixed Asset Closure

Rio Tinto
  • 0.00TRIFR / LTIFR
  • >30,000Total workhours
  • >7,600M3Grout placement
  • 14 DAYSContinuous backfilling
  • 37MUnderground vault depth
  • >1,000Heavy vehicle movements
  • 1,500M3Contaminated spoil
  • 15,000M2Rehabilitated area
  • 7,448M3CLSM placed
  • Impacted Soil
  • Elevated Work Platforms
  • Engineered Modelling & 3D
  • Mechanical Demolition
  • Hot Works
  • Steel Recycling
  • Bulk Earthworks
  • Enviro Controls & Monitoring
  • Backfilling & Compaction
  • Site Establishment
  • Induced Collapse
  • 2026 Civil Contractors Federation WA Earth Awards winner ($10-30m)
  • Integrated demolition, civil and rehabilitation works program in remote region of The Pilbara in Western Australia
  • Induced collapse and mechanical demolition methodologies employed for a variety of industrial structures – Car Dumper 1; CO1 Conveyor; Dust Collector 07
  • Construction of a redesigned rail access road to improve drainage and site functionality
  • Programming and sequencing of works to accommodate remote location, including Comprehensive Level 2 Risk Assessments for all demolition activities and delayed approvals for contaminated soil
  • Innovative technical solutions to overcome complex challenges, including electrical disconnections during a restricted shutdown window, the controlled (induced collapse) felling of Dust Collector 07, and the safe dismantling of the CO1 conveyor within a confined tunnel environment