Gippsland Campaign 1 Decommissioning
ESSO Australia
- 60,000TSteel dismantled
- >95%Resource recovery rate
- Scheduling & Sequencing Plans
- Cleaning of Residual By Products
- Asset Recovery & Salvage
- Decommissioning
- Scaffolding & Ropes Access
- Enviro Controls & Monitoring
- Mechanical Demolition
- Temp Works Engineering
- Long Reach Demolition
- Engineered Modelling & 3D Simulation
- Third Party Engineering
- Stakeholder Engagement
- Hazmat Removal
- Cut & Lift Demolition
- Propping & Bracing
- Explosive Demolition
- Concrete Recycling
- Steel Recycling
- Waste Transfer
- Waste Stream Tracking
- Sustainability Reporting
- Site Establishment
- Induced Collapse
- Cranage & Rigging
- Social Procurement
- Live Environments
Unique Attributes
- Largest single campaign of oil and gas decommissioning in Australia
- Accept care, custody and control of up to 12 topsides and 11 jackets at Barry Beach Marine Terminal, serving as the Onshore Reception Centre for safe decontamination and dismantling
- Decontamination of contaminated process equipment
- Design and execution of felling for the structures
- Waste segregation, classification and management, including design and install of a waste water treatment system
Key Challenges
- Intersection of the project site with an internationally significant wetland, designated under the Ramsar convention
- Project site borders an operational marine supply base to support remaining facilities in the Bass Strait. Nearby proximity to another port facility, commercial and residential properties
- Strict enviro controls and measures. Management of contaminated process equipment during decontamination and demolition
×![]()